The Construction and Performance Test of High-Speed Satellite Network Pilot System for Hydrological observations 


Vol. 35,  No. 7, pp. 715-724, Jul.  2010


PDF
  Abstract

K-water has used satellite networks for 12 years for hydrological observation in various parts such as remote data acquisition and providing information including flood forecasting. It is the time to replace equipments according to long-term use of the system. A pilot system for high speed satellite networks is implemented by seven terminals, three 2-hops and 1 hub in Ku-Band bandwidth by using VSAT. According to the result for the performance test on the system, the result fot all items, including Link Budget designed meets performance levels.

  Statistics
Cumulative Counts from November, 2022
Multiple requests among the same browser session are counted as one view. If you mouse over a chart, the values of data points will be shown.


  Cite this article

[IEEE Style]

S. Hong, G. Shin, S. Jang, S. Park, "The Construction and Performance Test of High-Speed Satellite Network Pilot System for Hydrological observations," The Journal of Korean Institute of Communications and Information Sciences, vol. 35, no. 7, pp. 715-724, 2010. DOI: .

[ACM Style]

Sung-Teak Hong, Gang-Wook Shin, Sung-Woon Jang, and Seong-Soo Park. 2010. The Construction and Performance Test of High-Speed Satellite Network Pilot System for Hydrological observations. The Journal of Korean Institute of Communications and Information Sciences, 35, 7, (2010), 715-724. DOI: .

[KICS Style]

Sung-Teak Hong, Gang-Wook Shin, Sung-Woon Jang, Seong-Soo Park, "The Construction and Performance Test of High-Speed Satellite Network Pilot System for Hydrological observations," The Journal of Korean Institute of Communications and Information Sciences, vol. 35, no. 7, pp. 715-724, 7. 2010.